Creating and structuring Projects > Copying and reusing Project components > Copying Message configurations > Copying a Message configuration in a Project

Copying a Message configuration in a Project
This section describes how to copy a Message configuration in a Design Center Project.
To copy a Message configuration
In this procedure, Source Message is the original Message configuration, and Target Message is the copy.
1
2
3
Post requisites
Before and After Message scripts are not copied. If you want to reuse scripts defined in the original Message configuration, you must add them manually to the Target Message (e.g. copy from Source Message and paste into Target Message).
The document type connection is not copied. If you want to set a document type for the Target Message, you must do it manually.
OpenText StreamServe 5.6 Updated: 2013-03-01